Logistics

Planning Types in Standard SAP S&OP

In SAP logistics, a planning type defines the layout or the format of the planning table and thus represents the link between the planning table, where the actual planning is carried out, and the info structure in which the planning data is stored.

 

You can create several planning types for one info structure. For example, two different planning types may contain planning data for two seasons (autumn and winter). The data is stored in the info structure, so the different planning types depend on each other because they use the same set of data. If you use level-by-level planning, you must create a separate planning type for each planning level.

 

SAP S&OP Planning Types

Standard sales & operations planning (S&OP) within the logistics lines of business of SAP S/4HANA has been configured with three planning types, which are used automatically in standard S&OP planning:

  • SOPKAPA: Planning type for the planning of individual product groups.
  • SOPKAPAM: Planning type for the planning of individual materials.
  • SOPDIS: Planning type for the dual-level planning of product group hierarchies.

In the following sections, we’ll go through the steps you need to follow to create a product group that you can use in standard S&OP. We also show how you can transfer the planning results of a product group to demand management as PIRs.

 

Create a Product Group

The figure below shows that in this example, we’re using info structure S076 in standard S&OP to create a product group called Troy_SOP for plant 1000. This product group has two materials, 40000022 and 40000023, with a proportional factor of 60% and 40%, respectively.

 

Create Product Group

 

For this example, to create the product group in the system, follow the SAP menu path, Logistics > Production > SOP > Product Group > Create, or use Transaction MC84. For the Product group Troy_SOP and Plant 1000, enter the materials, “40000022” and “40000023” and their proportional factors of “60” and “40” (percentages).

 

Choose the Product Group Graphic button to view the product group graphically.

 

Product Group Graphic

 

In addition to the interactive entry, you can also calculate proportional factors on the basis of historical data via the menu path, More > Edit > Calculate Proportional Factors. You can use this option to see how well your self-defined (manual) proportional factors compare with what the system proposes and may enable you to prepare a realistic plan. Moreover, you can equally distribute the proportional factors via More > Edit > Distribute Proportional Factors. Save the product group.

 

Create a Plan for the Product Group

To plan the product group in standard S&OP, use the menu path, Logistics > Production > SOP > Planning > For Product Group > Create, or use Transaction MC81.

 

Create Plan

 

The figure above shows the initial screen of the rough-cut plan for the product. Enter the Product group “Troy_SOP” and Plant “1000”, and then press (Enter) to go to the Define Version dialog box. In this screen, enter the planning Version “002” and the Version description as “Troy_SOP_PG”, and again press (Enter) to go to the Create Rough-Cut Plan screen.

 

If the historical key figure data is already available in the system, you can import it to create a sales plan. Alternatively, you can manually enter the Sales quantities in the Planning table, as we’ve done in this example, by entering sales data for the next six months. As shown in the next figure, click the More dropdown menu to see several options to create a sales plan for the product group (or for an individual material, where applicable):

  • Transfer plan from SIS
  • Transfer CO-PA plan
  • Forecast
  • Transfer product group proportional from production or from sales

To use any of these options, the system must have significant historical data to help in effective and reliable planning.

 

Create Rough-Cut Plan

 

Options to Create a Production Plan Automatically

While remaining in the planning table (Transaction MC81), you can create a production plan with the following options by clicking on More from the top menu bar (see next figure):

  • Synchronous to sales: Sales figures are used as operations plans.
  • Target stock level: The operations plan is configured in such a way that the target stock level is reached in each period.
  • Target days’ supply: The operations plan is configured in such a way that the target stock level is reached in each period.
  • Stock level = zero: The operations plan is configured in such a way that the entire stock level is consumed.

Depending on your business requirement, you can choose if you want the production plan to be equal to the target stock level or if you eventually want the target stock to be zero at the end of the period. In this example, we want to create the production plan synchronous to the sales plan. This production plan has also taken the target stock levels into account at the end of each period.

 

Create Rough Cut Plan

 

It’s important to note that these production figures have no direct implications on the production or procurement. The purpose of entering or incorporating these numbers (key figures, e.g., sales or production) is to come to a common understanding, where relevant stakeholders, be it sales or production, can transfer the finalized key figures to demand management in the form of PIRs.

 

For example, several planning versions are created in the system from which input and feedback from sales and production are taken. The sales or the production figures are revised either in the same planning version or by creating a new version. The finalized version eventually transfers to demand management and reflects as PIRs with the Active checkbox selected.

 

The next step is to transfer the production plan to demand management, where the requirements of individual members (materials) of the product group are reflected as PIRs. When the transfer of the product group quantities to demand management takes place, the system disaggregates at the material level according to the proportional factor defined previously.

 

In this example, we’ve given a proportional factor of 60% and 40% for the two materials. In the next section, we show how the system disaggregates (divides up) the total planning quantities of the product group in a 60 to 40 ratio.

 

Transfer to Demand Management

You can directly transfer the planning figures from the planning table to demand management by selecting the relevant key figures (e.g., production) and using the menu path, More > Extras > Transfer to Demand Management. Alternatively, you can also use the menu path, Logistics > Production > SOP > Planning > For Product Group > Transfer PG to Demand Management, or you can use Transaction MC75.

 

Transfer Planning Data to Demand Management

 

Above shows the initial screen in which you assign the Version “002” of the product group and plant for transfer to demand management. The Prod.plan for mat. or PG members as proportion of PG radio button enables you to transfer the production plan to demand management.

 

You can also specify the requirement type and the version of PIR within which the system transfers the values. In this example, assign Requirements type as “VSF” and Version as “00”, and choose Transfer now. A message log appears after the transfer is made.

 

Planned Independent Requirements in Demand Management

To check and confirm whether production figures of the product group were successfully transferred in demand management as PIRs, follow the SAP menu path, Logistics > Production > Demand Management > Planned Independent Requirements > Display, or use Transaction MD63.

 

On the initial screen, you enter the selection parameters such as Product group “PUMP_SOP”, Plant “1000”, Requirements type “VSF”, and Selected version “00”, which were all previously defined. Press (Enter), and the following figure shows how the product group breaks down into individual members (materials) with the transferred quantity divided in a ratio of 60% to 40%.

 

Planned Individual Requirements Change Table

 

Editor’s note: This post has been adapted from a section of the book Production Planning with SAP S/4HANA by Jawad Akhtar.

Recommendation

1795
Production Planning with SAP S/4HANA

Allocate your materials, personnel, and machinery with SAP S/4HANA! This comprehensive guide will show you how to configure production planning in SAP S/4HANA for discrete, process, and repetitive manufacturing. Then run those processes using step-by-step instructions. Master production workflows, like batch management, S&OP, demand management, and MRP. With industry examples throughout, this guide is your one-stop shop for PP with SAP S/4HANA!

Learn More
SAP PRESS
by SAP PRESS

SAP PRESS is the world's leading SAP publisher, with books on ABAP, SAP S/4HANA, SAP CX, intelligent technologies, SAP Business Technology Platform, and more!

Comments